Competitive Tariff Structure

  • Two Part Tariff For Firm Consumers Within The DVC Command Area At All Voltage Levels (33KV/132KV) As Per Provisional Tariff Order Of CERC Dtd. 23.06.2011
    • Capacity charge @171.47P/Kwh.
    • Variable Energy Charge @222.4P/Kwh for the month of January, 2012.
    • And
    • Charging single part tariff @393.87P/Kwh with variable energy charge as per CERC formula on monthly basis pending retail tariff order of appropriate state commissions.
    • However, DVC submitted MYT petition for the period 2011-14 to WBERC & JSERC & awaiting retail tariff orders.
  • Tariff For Beneficiaries On Day Ahead Scheduling Mode.
    • Power scheduled from respective generating station will be guided by the terms of Bilateral PPA.
    • Generation tariff & Transmission tariff for DVC network as determined by CERC will be charged.
    • Beneficiaries from upcoming generating stations, for which there is no tariff order by CERC till date, provisional tariff as per relevant CERC regulation for the period 2009-14 will be made applicable.

Stable, Reliable and Quality Power.

Two sources of power (Hydel & Thermal), a vast network of transmission system interconnecting tie lines with adjoining system and power grid coupled with dedicated feeder for power supply to ensure stable, reliable and quality power in terms of regulatory norms.

Prompt and Efficient System

Single window system for redressal of consumer complaints at the office of the Chief Engineer (Commercial), DVC, Kolkata ensuring simple procedure for getting service connection for power supply.

DVC's Operation & Maintenance wing of T&D system & generating stations offering prompt and efficient services in the event of breakdown in power supply and transmission lines.